Travelled to:
1 × China
1 × USA
Collaborated with:
M.Sugi J.Ota M.Yamamoto M.Cheng H.Ito Y.Shiomi T.Okubo H.Kojima
Talks about:
cut (2) semiconductor (1) rectangular (1) manufactur (1) reschedul (1) dimension (1) schedul (1) process (1) problem (1) stabil (1)
Person: Kazuyoshi Inoue
DBLP: Inoue:Kazuyoshi
Contributed to:
Wrote 2 papers:
- CASE-2007-ShiomiSOOYKI #2d #problem #process
- The Solution of 2-Dimensional Rectangular Cutting Stock Problem Considering Cutting Process (YS, MS, JO, TO, MY, HK, KI), pp. 140–145.
- CASE-2006-ChengSOYII #performance #scheduling
- A fast rescheduling method in semiconductor manufacturing allowing for tardiness and scheduling stability (MC, MS, JO, MY, HI, KI), pp. 100–105.