Travelled to:
1 × Greece
2 × China
4 × USA
Collaborated with:
N.Kuwahara T.Ogata M.Sugi Z.Huang A.Nagata M.Kanai-Pak J.Maeda Y.Kitajima M.Nakamura S.Hoshino T.Arai T.Ueyama M.Cheng O.Kanezashi N.Miyata M.Yamamoto K.Inoue K.Aida K.Aida L.B.Gueta R.Chiba H.I.Ozaku K.Kogure I.Matsumura Y.Tamura Y.Chen Toshiyuki Takada Arent W. de Jong Jose Ildefonso U. Rubrico Masaru Adachi T.Nakamura H.Ito Y.Shiomi T.Okubo H.Kojima
Talks about:
system (6) robot (4) self (4) nurs (4) schedul (3) problem (3) patient (3) design (3) train (3) oper (3)
Person: Jun Ota
DBLP: Ota:Jun
Contributed to:
Wrote 14 papers:
- DHM-2014-HuangNKMKNAKOO #self
- Robot Patient for Nursing Self-training in Transferring Patient from Bed to Wheel Chair (ZH, AN, MKP, JM, YK, MN, KA, NK, TO, JO), pp. 361–368.
- DHM-2014-KitajimaNMKAHNOKO #education
- Robotics as a Tool in Fundamental Nursing Education (YK, MN, JM, MKP, KA, ZH, AN, TO, NK, JO), pp. 392–402.
- DHM-HB-2013-NakamuraKOOHNAKMK #artificial reality #learning #self #student #towards #using
- The Relationship between Nursing Students’ Attitudes towards Learning and Effects of Self-learning System Using Kinect (MN, YK, JO, TO, ZH, AN, KA, NK, JM, MKP), pp. 111–116.
- DHM-SET-2013-HuangNKMKNAKOO #self
- Feedback-Based Self-training System of Patient Transfer (ZH, AN, MKP, JM, YK, MN, KA, NK, TO, JO), pp. 197–203.
- DHM-SET-2013-NagataHKMKNAKOO #development #evaluation #metric #process #self
- Development of a Measurement and Evaluation System for Bed-Making Activity for Self-training (AN, ZH, MKP, JM, YK, MN, KA, NK, TO, JO), pp. 268–275.
- CASE-2008-GuetaCAUO #configuration management #design #multi
- Design of the end-effector tool attachment for robot arm with multiple reconfigurable goals (LBG, RC, TA, TU, JO), pp. 876–881.
- CASE-2007-ChengOKKO #algorithm #problem #scheduling
- Simulated Annealing Algorithm for Daily Nursing Care Scheduling Problem (MC, HIO, NK, KK, JO), pp. 507–512.
- CASE-2007-HoshinoO #design #performance
- Performance Design of Operating Robots in a Seaport Container-Handling System (SH, JO), pp. 692–697.
- CASE-2007-ShiomiSOOYKI #2d #problem #process
- The Solution of 2-Dimensional Rectangular Cutting Stock Problem Considering Cutting Process (YS, MS, JO, TO, MY, HK, KI), pp. 140–145.
- CASE-2007-SugiMTOA #evaluation
- Quantitative Evaluation of Human Supporting Production System “Attentive Workbench” (MS, IM, YT, JO, TA), pp. 531–535.
- DHM-2007-KanezashiMO #difference #interface
- Strategy to Operate Cylindrical Interface-Operation Difference According to the Dimension of the Cylinder and That of the Hand (OK, NM, JO), pp. 865–873.
- CASE-2006-ChengSOYII #performance #scheduling
- A fast rescheduling method in semiconductor manufacturing allowing for tardiness and scheduling stability (MC, MS, JO, MY, HI, KI), pp. 100–105.
- CASE-2017-ChenOUTO #automation #design #image #parametricity #preprocessor #recognition
- Automated design of the field-of-view, illumination, and image pre-processing parameters of an image recognition system (YC, TO, TU, TT, JO), pp. 1079–1084.
- CASE-2017-JongRANO #automation #big data #estimation #problem #scheduling #towards
- Big data in automation: Towards generalized makespan estimation in shop scheduling problems (AWdJ, JIUR, MA, TN, JO), pp. 1516–1521.