Travelled to:
1 × China
1 × USA
Collaborated with:
J.Ota H.I.Ozaku N.Kuwahara K.Kogure M.Sugi M.Yamamoto H.Ito K.Inoue
Talks about:
schedul (2) semiconductor (1) manufactur (1) reschedul (1) algorithm (1) problem (1) stabil (1) method (1) anneal (1) tardi (1)
Person: Mingang Cheng
DBLP: Cheng:Mingang
Contributed to:
Wrote 2 papers:
- CASE-2007-ChengOKKO #algorithm #problem #scheduling
- Simulated Annealing Algorithm for Daily Nursing Care Scheduling Problem (MC, HIO, NK, KK, JO), pp. 507–512.
- CASE-2006-ChengSOYII #performance #scheduling
- A fast rescheduling method in semiconductor manufacturing allowing for tardiness and scheduling stability (MC, MS, JO, MY, HI, KI), pp. 100–105.