4 papers:
- CASE-2012-YanCLWC #scheduling
- Optimization-based litho machine scheduling with load balancing and reticle expiration (BY, HYC, PBL, SW, JC), pp. 575–580.
- DATE-2012-SharmaCAHCD #power management #variability
- Ultra low power litho friendly local assist circuitry for variability resilient 8T SRAM (VS, SC, MA, JH, FC, WD), pp. 1042–1047.
- CASE-2011-YanCLWC #multi #scheduling
- Optimization-based litho machine scheduling with multiple reticles and setups (BY, HYC, PBL, SW, JC), pp. 114–119.
- DAC-2007-TsaiZT #design #layout #modelling
- Modeling Litho-Constrained Design Layout (MCT, DZ, ZT), pp. 354–357.