BibSLEIGH
BibSLEIGH corpus
BibSLEIGH tags
BibSLEIGH bundles
BibSLEIGH people
EDIT!
CC-BY
Open Knowledge
XHTML 1.0 W3C Rec
CSS 2.1 W3C CanRec
email twitter
Travelled to:
1 × Canada
1 × China
1 × India
1 × Italy
1 × Korea
1 × Sweden
1 × Taiwan
5 × USA
Collaborated with:
Z.Shi T.Wu J.Song L.Pi B.Sun L.Wang Y.Pan W.Chen X.Shao Weihao Wang G.Zhu G.Argote-Garcia X.He Y.Fu S.Gao X.Zhang Y.Han X.Guan H.Yau Zewen Huang Lingxuan Liu Hongyu He P.Liu H.Gao S.Hoerning P.J.Clarke Z.Dong
Talks about:
problem (7) plan (6) approach (5) optim (5) method (4) schedul (3) product (3) partit (3) multi (3) level (3)

Person: Leyuan Shi

DBLP DBLP: Shi:Leyuan

Contributed to:

CASE 20152015
CASE 20142014
CASE 20132013
CASE 20122012
CASE 20112011
CASE 20092009
CASE 20082008
SEKE 20082008
CASE 20072007
SEKE 20072007
CASE 20062006
CASE 20052005
CASE 20162016
CASE 20192019

Wrote 21 papers:

CASE-2015-ShiLGS #problem
Production planning for a class of batch processing problem (ZS, PL, HG, LS), pp. 1188–1193.
CASE-2014-ShiWS #approximate #matrix
Approximation method to rank-one binary matrix factorization (ZS, LW, LS), pp. 800–805.
CASE-2013-GaoZS #evaluation #probability
Evaluation of improvement probability for IMRT plans (SG, XZ, LS), pp. 474–479.
CASE-2013-SunSS #optimisation #scheduling
Integrated operating room scheduling optimization under particularly workload constrain of surgeon (BS, JS, LS), pp. 972–977.
CASE-2013-SunSSZS #heuristic #optimisation
A linearized model and nested-partitions heuristics for VMAT radiation treatment planning optimization (BS, ZS, JS, GZ, LS), pp. 629–633.
CASE-2013-SunSZS #approach #optimisation
A two-stage approach for VMAT treatment plan optimization (BS, JS, GZ, LS), pp. 455–460.
CASE-2013-WangSS #novel #order #polynomial #problem #scheduling
A novel quadratic formulation for customer order scheduling problem (LW, ZS, LS), pp. 576–580.
CASE-2012-HoerningSWS #analysis #robust #simulation #tool support
Improving discrete event simulation in the emergency department with innovative and robust input analysis tools (SH, JS, TW, LS), pp. 131–136.
CASE-2011-WuS #bound #multi #problem
A lower and upper bound guided nested partitions method for solving capacitated multi-level production planning problems (TW, LS), pp. 78–83.
CASE-2009-WuS #heuristic #multi #problem
A new heuristic method for capacitated multi-level lot sizing problem with backlogging (TW, LS), pp. 483–488.
CASE-2008-ChenS #problem
A variant of examination timetabling problem (WC, LS), pp. 353–358.
SEKE-2008-Argote-GarciaCHFS #approach #architecture #formal method
A Formal Approach for Translating a SAM Architecture to PROMELA (GAG, PJC, XH, YF, LS), pp. 440–447.
CASE-2007-HanGS
Optimal Supply Location Selection and Routing for Emergency Material Delivery (YH, XG, LS), pp. 1039–1044.
CASE-2007-PiS #process
Resource-Task Assignment Process with Rejections and Reassignments (LP, LS), pp. 448–453.
SEKE-2007-FuDASH #approach #correctness #java #validation
An Approach to Validating Translation Correctness From SAM to Java (YF, ZD, GAG, LS, XH), p. 45–?.
CASE-2006-PiPS #problem
Nested Partitions Method for the Local Pickup and Delivery Problem (LP, YP, LS), pp. 375–380.
CASE-2005-PanSY #approach #optimisation #problem
A new optimization approach to the general single machine earliness-tardiness problem (YP, LS, HY), pp. 43–48.
CASE-2016-ShaoS #metamodelling
Enhancing feasibility determination with kriging metamodels (XS, LS), pp. 476–481.
CASE-2016-ShiHS
Two-stage flow shop with a batch processor and limited buffer (ZS, ZH, LS), pp. 395–400.
CASE-2019-LiuHS #approach #exponential #learning #scheduling
A new solution approach for flow shop scheduling with an exponential time-dependent learning effect (LL, HH, LS), pp. 468–473.
CASE-2019-WangS #multi
Multi-level Lot-streaming Production Planning with the Objective of Workload Balancing (WW, LS), pp. 685–690.

Bibliography of Software Language Engineering in Generated Hypertext (BibSLEIGH) is created and maintained by Dr. Vadim Zaytsev.
Hosted as a part of SLEBOK on GitHub.