Travelled to:
1 × Canada
1 × China
1 × India
1 × Italy
1 × Korea
1 × Sweden
1 × Taiwan
5 × USA
Collaborated with:
Z.Shi T.Wu J.Song L.Pi B.Sun L.Wang Y.Pan W.Chen X.Shao Weihao Wang G.Zhu G.Argote-Garcia X.He Y.Fu S.Gao X.Zhang Y.Han X.Guan H.Yau Zewen Huang Lingxuan Liu Hongyu He P.Liu H.Gao S.Hoerning P.J.Clarke Z.Dong
Talks about:
problem (7) plan (6) approach (5) optim (5) method (4) schedul (3) product (3) partit (3) multi (3) level (3)
Person: Leyuan Shi
DBLP: Shi:Leyuan
Contributed to:
Wrote 21 papers:
- CASE-2015-ShiLGS #problem
- Production planning for a class of batch processing problem (ZS, PL, HG, LS), pp. 1188–1193.
- CASE-2014-ShiWS #approximate #matrix
- Approximation method to rank-one binary matrix factorization (ZS, LW, LS), pp. 800–805.
- CASE-2013-GaoZS #evaluation #probability
- Evaluation of improvement probability for IMRT plans (SG, XZ, LS), pp. 474–479.
- CASE-2013-SunSS #optimisation #scheduling
- Integrated operating room scheduling optimization under particularly workload constrain of surgeon (BS, JS, LS), pp. 972–977.
- CASE-2013-SunSSZS #heuristic #optimisation
- A linearized model and nested-partitions heuristics for VMAT radiation treatment planning optimization (BS, ZS, JS, GZ, LS), pp. 629–633.
- CASE-2013-SunSZS #approach #optimisation
- A two-stage approach for VMAT treatment plan optimization (BS, JS, GZ, LS), pp. 455–460.
- CASE-2013-WangSS #novel #order #polynomial #problem #scheduling
- A novel quadratic formulation for customer order scheduling problem (LW, ZS, LS), pp. 576–580.
- CASE-2012-HoerningSWS #analysis #robust #simulation #tool support
- Improving discrete event simulation in the emergency department with innovative and robust input analysis tools (SH, JS, TW, LS), pp. 131–136.
- CASE-2011-WuS #bound #multi #problem
- A lower and upper bound guided nested partitions method for solving capacitated multi-level production planning problems (TW, LS), pp. 78–83.
- CASE-2009-WuS #heuristic #multi #problem
- A new heuristic method for capacitated multi-level lot sizing problem with backlogging (TW, LS), pp. 483–488.
- CASE-2008-ChenS #problem
- A variant of examination timetabling problem (WC, LS), pp. 353–358.
- SEKE-2008-Argote-GarciaCHFS #approach #architecture #formal method
- A Formal Approach for Translating a SAM Architecture to PROMELA (GAG, PJC, XH, YF, LS), pp. 440–447.
- CASE-2007-HanGS
- Optimal Supply Location Selection and Routing for Emergency Material Delivery (YH, XG, LS), pp. 1039–1044.
- CASE-2007-PiS #process
- Resource-Task Assignment Process with Rejections and Reassignments (LP, LS), pp. 448–453.
- SEKE-2007-FuDASH #approach #correctness #java #validation
- An Approach to Validating Translation Correctness From SAM to Java (YF, ZD, GAG, LS, XH), p. 45–?.
- CASE-2006-PiPS #problem
- Nested Partitions Method for the Local Pickup and Delivery Problem (LP, YP, LS), pp. 375–380.
- CASE-2005-PanSY #approach #optimisation #problem
- A new optimization approach to the general single machine earliness-tardiness problem (YP, LS, HY), pp. 43–48.
- CASE-2016-ShaoS #metamodelling
- Enhancing feasibility determination with kriging metamodels (XS, LS), pp. 476–481.
- CASE-2016-ShiHS
- Two-stage flow shop with a batch processor and limited buffer (ZS, ZH, LS), pp. 395–400.
- CASE-2019-LiuHS #approach #exponential #learning #scheduling
- A new solution approach for flow shop scheduling with an exponential time-dependent learning effect (LL, HH, LS), pp. 468–473.
- CASE-2019-WangS #multi
- Multi-level Lot-streaming Production Planning with the Objective of Workload Balancing (WW, LS), pp. 685–690.