Travelled to:
1 × Canada
1 × Sweden
1 × USA
2 × Germany
Collaborated with:
C.Malz N.Jazdi V.F.d.L.Jr. A.Brito R.Lauber J.Biewald H.Schelling T.Beyer R.Yousefifar S.Abele M.Bordasch K.Wehking C.Sebeke C.Jung K.Harbich S.Fuchs J.Schwarz
Talks about:
softwar (2) system (2) engin (2) agent (2) test (2) microelectron (1) undergradu (1) techniqu (1) challeng (1) student (1)
Person: Peter Göhner
DBLP: G=ouml=hner:Peter
Contributed to:
Wrote 5 papers:
- CASE-2015-BeyerYABGW #adaptation #flexibility
- Flexible agent-based planning and adaptation of material handling systems (TB, RY, SA, MB, PG, KHW), pp. 1060–1065.
- ICST-2012-MalzJG #fuzzy #logic #testing #using
- Prioritization of Test Cases Using Software Agents and Fuzzy Logic (CM, NJ, PG), pp. 483–486.
- CSEET-2006-LucenaBG #case study #education #experience #re-engineering #student
- A Germany-Brazil Experience Report on Teaching Software Engineering for Electrical Engineering Undergraduate Students (VFdLJ, AB, PG), pp. 69–76.
- DATE-2006-SebekeJHFSG #challenge #reliability
- Test and reliability challenges in automotive microelectronics (CS, CJ, KH, SF, JS, PG), p. 547.
- ICSE-1979-LauberBGS #automation #design #realtime #specification
- EPOS : A Specification and Design Technique for Computer Controlled Real-time Automation Systems (RL, JB, PG, HS), pp. 245–250.