Travelled to:
1 × Canada
1 × India
1 × Taiwan
1 × USA
Collaborated with:
F.Chu N.Wu M.Zhou Y.Liu K.Wang E.E.Longomo X.Song D.Ouelhadj Y.Wu Q.Shen H.Chen S.Peng
Talks about:
time (4) transport (2) program (2) cluster (2) model (2) tool (2) arm (2) constraint (1) constrain (1) algorithm (1)
Person: Chengbin Chu
DBLP: Chu:Chengbin
Contributed to:
Wrote 6 papers:
- CASE-2014-ChuLSO #analysis #contract #flexibility #linear #parametricity #programming #using
- Flexibility analysis on a supply chain contract using a parametric Linear Programming model (CC, EEL, XS, DO), pp. 704–709.
- CASE-2010-LiuCW #programming
- Aggregated state dynamic programming for operating theater planning (YL, CC, KW), pp. 1013–1018.
- CASE-2009-WuCCW #heuristic #problem
- Heuristic for lane reservation problem in time constrained transportation (YW, CC, FC, NW), pp. 543–548.
- CASE-2009-WuCCZ #approach #clustering #novel #scheduling #tool support
- A novel approach to scheduling of single-arm cluster tools with wafer revisiting (NW, FC, CC, MZ), pp. 567–572.
- CASE-2008-ChuCSC #algorithm #polynomial
- An O(T3) Polynomial algorithm for crude oil transportation (FC, CC, QS, HC), pp. 303–308.
- CASE-2008-WuZPCC #clustering #constraints #modelling #petri net #process #realtime #tool support
- Petri net modeling and real-time control of dual-arm cluster tools with residency time constraint and activity time variations (NW, MZ, SP, FC, CC), pp. 109–114.