Travelled to:
1 × Italy
Collaborated with:
Y.Kao S.Zhan S.Chang P.Wang P.B.Luh S.Wang F.Wang J.Chang
Talks about:
constraint (1) furnac (1) optim (1) batch (1) alloc (1) wait (1) tool (1) time (1) near (1)
Person: Jen-Hsuan Ho
DBLP: Ho:Jen=Hsuan
Contributed to:
Wrote 1 papers:
- CASE-2011-KaoZCHWLWWC #constraints
- Near optimal furnace tool allocation with batching and waiting time constraints (YTK, SCZ, SCC, JHH, PW, PBL, SW, FW, JC), pp. 108–113.