Travelled to:
1 × Italy
1 × Korea
Collaborated with:
P.B.Luh S.Wang B.Yan H.Y.Chen Y.Kao S.Zhan S.Chang J.Ho P.Wang F.Wang
Talks about:
optim (3) schedul (2) reticl (2) machin (2) litho (2) base (2) constraint (1) multipl (1) furnac (1) balanc (1)
Person: Joey Chang
DBLP: Chang:Joey
Contributed to:
Wrote 3 papers:
- CASE-2012-YanCLWC #scheduling
- Optimization-based litho machine scheduling with load balancing and reticle expiration (BY, HYC, PBL, SW, JC), pp. 575–580.
- CASE-2011-KaoZCHWLWWC #constraints
- Near optimal furnace tool allocation with batching and waiting time constraints (YTK, SCZ, SCC, JHH, PW, PBL, SW, FW, JC), pp. 108–113.
- CASE-2011-YanCLWC #multi #scheduling
- Optimization-based litho machine scheduling with multiple reticles and setups (BY, HYC, PBL, SW, JC), pp. 114–119.