Travelled to:
1 × Italy
1 × Taiwan
Collaborated with:
S.Chang C.Chang S.Zhan J.Ho P.Wang P.B.Luh S.Wang F.Wang J.Chang
Talks about:
target (2) semiconductor (1) constraint (1) consider (1) variabl (1) perform (1) improv (1) furnac (1) fabric (1) optim (1)
Person: Yu-Ting Kao
DBLP: Kao:Yu=Ting
Contributed to:
Wrote 2 papers:
- CASE-2014-KaoCC #performance #variability
- Target setting with consideration of target-induced operation variability for performance improvement of semiconductor fabrication (YTK, SCC, CMC), pp. 774–779.
- CASE-2011-KaoZCHWLWWC #constraints
- Near optimal furnace tool allocation with batching and waiting time constraints (YTK, SCZ, SCC, JHH, PW, PBL, SW, FW, JC), pp. 108–113.