Proceedings of the First International Conference on Automation Science and Engineering
CASE, 2005.
@proceedings{CASE-2005, address = "Edmonton, Alberta, Canada", isbn = "0-7803-9425-9", publisher = "{IEEE}", title = "{Proceedings of the First International Conference on Automation Science and Engineering}", year = 2005, }
Contents (70 items)
- CASE-2005-Delaney #challenge #generative
- Next generation earth and ocean sciences: opportunities and challenges (JRD).
- CASE-2005-MillerSSLM #analysis #using
- Biopsy preparation for flow analysis using microfabricated disaggregation blades (AKM, MLS, CAS, XL, SM), pp. 1–6.
- CASE-2005-MeldrumHFSMRPMCDW #analysis
- Sample preparation in glass capillaries for high-throughput biochemical analyses (DRM, MH, CHF, MSS, SKM, TTHR, WHP, SEM, DLC, DAD, PJW), pp. 7–12.
- CASE-2005-KoschwanezHCMGM #analysis #automation
- Automated lifetime analysis of a single yeast cell (JK, MH, RHC, MM, DG, DRM), pp. 13–18.
- CASE-2005-MaheshFWL #agile #benchmark #metric #prototype
- Benchmarking for decision making in rapid prototyping systems (MM, JYHF, YSW, HTL), pp. 19–24.
- CASE-2005-KimD #metric #process #quality #using
- Quality measurement of production process plan using tolerance chart (IHK, ZD), pp. 25–30.
- CASE-2005-TakeuchiS #design
- Design for product-embedded disassembly pathways (ST, KS), pp. 31–36.
- CASE-2005-JainR #analysis #modelling #using
- Analysis of base-stock controlled production-inventory system using discrete-time queueing models (SJ, NRSR), pp. 37–42.
- CASE-2005-PanSY #approach #optimisation #problem
- A new optimization approach to the general single machine earliness-tardiness problem (YP, LS, HY), pp. 43–48.
- CASE-2005-ZhangZNZ
- Production planning with joint resources usage semiconductor test manufacturing (ZZ, MTZ, SN, LZ), pp. 49–54.
- CASE-2005-PachnerBR #optimisation
- Intensive fish breeding optimization (DP, PB, BR), pp. 55–60.
- CASE-2005-PeddiZCC #automation #effectiveness #performance
- Efficient and effective path for automated dispensing of bio-precipitant solutions (AP, YFZ, VC, MC), pp. 61–66.
- CASE-2005-ZhuZL #adaptation
- An adaptive PI controller for regulation of pressure of hypertension patients (KZ, HZ, JL), pp. 67–72.
- CASE-2005-ZhuD #design #layout #synthesis
- Grasp synthesis and fixture layout design in discrete domain (XZ, HD), pp. 73–78.
- CASE-2005-GoemansLGS #design #on the
- On the design of guillotine traps for vibratory bowl feeders (OCG, AL, KG, AFvdS), pp. 79–86.
- CASE-2005-MervynKN #adaptation #design #process
- An adaptive fixture design system for integrated product and process design (FM, ASK, AYCN), pp. 87–92.
- CASE-2005-TangK #distributed #game studies #modelling #multi #problem
- Cooperation in a multi-stage game for modeling distributed task delegation in a supply chain procurement problem (KT, SRTK), pp. 93–98.
- CASE-2005-JungCJ #coordination
- A production-distribution coordinating model for third party logistics partnership (HJ, FFC, BJ), pp. 99–104.
- CASE-2005-ZhangNML #configuration management #multi #optimisation
- Multi-factory optimization enables kit reconfiguration in semiconductor manufacturing (MTZ, SN, MM, QL), pp. 105–112.
- CASE-2005-LeeH #analysis #array #design
- An integrated system of microcantilever arrays with carbon nanotube tips for bio/nano analysis: design and control (EL, HSH), pp. 113–117.
- CASE-2005-LiX #2d #design #novel #parallel
- Optimal design of a novel 2-DOF compliant parallel micromanipulator for nanomanipulation (YL, QX), pp. 118–123.
- CASE-2005-GongHYL #precise
- Experimental-model-based precision control of a piezoelectric actuated flexure stage (ZG, EHLH, GY, WL), pp. 124–129.
- CASE-2005-PengLZ #approach #fuzzy #set
- Intelligent setup planning in manufacturing by fuzzy set theory based approach (GP, WL, YZ), pp. 130–135.
- CASE-2005-DulluriSR #predict
- Predicting price-tag for customized goods (SD, PS, NRSR), pp. 136–141.
- CASE-2005-FigueiredoJ #using
- Nonholonomic systems stabilization and tracking control using discontinuous control (LCF, FGJ), pp. 142–147.
- CASE-2005-KimKYT #identification #realtime #using
- Dynamic shipment planning in an automobile shipment yard using real-time radio frequency identification (RFID) information (JK, SRTK, STY, JDT), pp. 148–153.
- CASE-2005-GuschinskayaDGL #approach #heuristic #optimisation
- A combined heuristic approach for optimization of a class of machining lines (OG, AD, NG, GL), pp. 154–159.
- CASE-2005-ZhangFZ #assembly #capacity #modelling #multi #workflow
- Dynamic capacity modeling with multiple re-entrant workflows in semiconductor assembly manufacturing (MTZ, JF, EZ), pp. 160–165.
- CASE-2005-NajmabadiGE #automation #scalability
- A scalable robotic-based laboratory automation system for medium-sized biotechnology laboratories (PN, AAG, AE), pp. 166–171.
- CASE-2005-SongHQG #automation #documentation #using
- Automating inspection and documentation of remote building construction using a robotic camera (DS, QH, NQ, KG), pp. 172–177.
- CASE-2005-LuhMSYSXJC
- Coherent configuration and operation of building transportation systems (PBL, LM, ESJ, DY, AS, BX, GJ, SCC), pp. 178–184.
- CASE-2005-HungHWCLH #collaboration #framework
- A secure collaborative e-diagnostics framework for semiconductor factories (MHH, FYH, TLW, FTC, RL, TH), pp. 185–190.
- CASE-2005-NgYHD #energy #process
- Diagnosis of sheet metal stamping processes based on thermal energy distribution (YMHN, MY, YH, RD), pp. 191–196.
- CASE-2005-XueSG #multi
- Multi-objective evolutionary decision support for design-supplier-manufacturing planning (FX, ACS, RJG), pp. 197–202.
- CASE-2005-ChiangF #problem #scheduling
- An iterative refining mechanism for general job shop scheduling problems (TCC, LCF), pp. 203–208.
- CASE-2005-LiBM #design #quality
- Manufacturing system design to improve quality buy rate (JL, DB, SPM), pp. 209–214.
- CASE-2005-LeeK #behaviour #distributed #multi
- Estimating global stress environment by observing local behavior in distributed multiagent systems (SL, SRTK), pp. 215–219.
- CASE-2005-KameshwaranN #evaluation #heuristic
- A Lagrangian heuristic for bid evaluation in e-procurement auctions (SK, YN), pp. 220–225.
- CASE-2005-LauS #evaluation #multi
- Evaluation of time-varying availability in multi-echelon inventory system under combat damage (HCL, HS), pp. 226–231.
- CASE-2005-ViswanadhamB #outsourcing
- Foreign direct investment or outsourcing: a supply chain decision model (NV, KB), pp. 232–237.
- CASE-2005-HuangCS
- Computer controlled measuring center (JTH, CHC, SHS), pp. 238–243.
- CASE-2005-DaiG #development #metric
- Development of impulse resistance measurement instrument (WD, SG), pp. 244–248.
- CASE-2005-ChenJL
- Right-circular corner-filleted flexure hinges (GMC, JJ, ZL), pp. 249–253.
- CASE-2005-Hwang #approach #automation #behaviour #configuration management #finite #generative
- Generating finite-state global behavior of reconfigurable automation systems: DEVS approach (MHH), pp. 254–260.
- CASE-2005-AlenljungL #graph #modelling
- Simplified modeling of manufacturing systems: an introduction to sensor activation graphs (TA, BL), pp. 261–266.
- CASE-2005-CengicALYF #composition #implementation #using
- Implementation of full synchronous composition using IEC 61499 function blocks (GC, KÅ, BL, CY, PMF), pp. 267–272.
- CASE-2005-SuCHLL #design #implementation
- Design and implementation of an intelligent prognostics system (YCS, FTC, MHH, YCL, RCL), pp. 273–278.
- CASE-2005-TanonkouBBX #approach #probability #problem #using
- Solving a stochastic inventory-location problem using Lagrangian relaxation approach (GAT, LB, RB, XX), pp. 279–284.
- CASE-2005-ViswanathanF
- Forecasting of service arrivals in a repair center (SV, YF), pp. 285–289.
- CASE-2005-HanJBL #image #metric
- Edge location of cannon barrel image based on non-contact measurement of CCD (BH, HJ, HB, ZL), pp. 290–294.
- CASE-2005-ChengY #bound #using
- Virtual object deformations using attributed boundary model (TMC, CCY), pp. 295–300.
- CASE-2005-ChangLJ #detection #fault #network #using
- Using a two-layer competitive Hopfield neural network for semiconductor wafer defect detection (CYC, SYL, MJ), pp. 301–306.
- CASE-2005-LennartsonFF #architecture #flexibility
- Control architecture for flexible production systems (BL, MF, PF), pp. 307–312.
- CASE-2005-AbdelhameedD #debugging #logic #network #programmable #source code
- Diagnosis and debugging of programmable logic controller control programs by neural networks (MMA, HD), pp. 313–318.
- CASE-2005-WangLWK #architecture #distributed #simulation #using
- Collision resolution simulation for distributed control architectures using LonWorks (MW, EL, EW, MK), pp. 319–326.
- CASE-2005-TsinarakisTV #hybrid #multi #petri net
- Studying multi-assembly machine production systems with hybrid timed Petri nets (GJT, NT, KPV), pp. 327–332.
- CASE-2005-CastelnuovoFP #approach #incremental #modelling #petri net #sequence
- An incremental Petri net approach to production sequence modeling (AC, LF, LP), pp. 333–338.
- CASE-2005-FalkmanLT #algebra #petri net #process #specification #using
- Specification of a batch plant using process algebra and Petri nets (PF, BL, MT), pp. 339–344.
- CASE-2005-LowWW #development #on the #realtime #using
- On the development of a real time control system by using xPC Target: solution to robotic system control (KHL, HW, MYW), pp. 345–350.
- CASE-2005-SchmidW #using
- Path planning for a humanoid using NURBS curves (AJS, HW), pp. 351–356.
- CASE-2005-KrefftH #optimisation #parallel
- Elastodynamic optimization of parallel kinematics (MK, JH), pp. 357–362.
- CASE-2005-BonfeFS #modelling #multi #object-oriented
- Object-oriented modeling of multi-domain systems (MB, CF, CS), pp. 363–368.
- CASE-2005-WangCL #capacity #robust #using
- Using shared resource capacity for robust control of failure prone manufacturing systems (SW, SFC, MAL), pp. 369–374.
- CASE-2005-ChewL #multi #robust
- Robust supervisory control for production systems with multiple resource failures (SFC, MAL), pp. 375–380.
- CASE-2005-ChangC #industrial #requirements
- Engineering-chain requirements for semiconductor industry (JYCC, FTC), pp. 381–386.
- CASE-2005-LiuHL #flexibility #scheduling #using
- Dynamic scheduling of flexible manufacturing system using support vector machines (YHL, HPH, YSL), pp. 387–392.
- CASE-2005-LastBH #self
- Self-calibration of the HEXA-parallel-structure (PL, CB, JH), pp. 393–398.
- CASE-2005-WeiL #concurrent #policy #programming #using
- A deadlock prevention policy for FMS using mathematical programming (NW, ZL), pp. 399–403.
- CASE-2005-LeeP #analysis #constraints #graph
- Steady state analysis of a timed event graph with time window constraints (TEL, SHP), pp. 404–409.
- CASE-2005-0001G #embedded
- Embedded supervisory control of discrete-event systems (YY, PG), pp. 410–415.
17 ×#using
9 ×#multi
8 ×#design
6 ×#analysis
6 ×#approach
6 ×#modelling
5 ×#automation
5 ×#optimisation
4 ×#metric
4 ×#problem
9 ×#multi
8 ×#design
6 ×#analysis
6 ×#approach
6 ×#modelling
5 ×#automation
5 ×#optimisation
4 ×#metric
4 ×#problem