Travelled to:
1 × Taiwan
2 × USA
Collaborated with:
J.Wu M.Gen J.Zheng Ying-Jen Chen H.Wang Y.Tsou X.Hao L.Lin Bo-Cheng Wang Yi-Chia Wu Peng-Chieh Lee Runliang Dou Chia-Cheng Chen
Talks about:
semiconductor (4) manufactur (4) schedul (3) problem (2) model (2) base (2) uncertainti (1) constraint (1) multivari (1) multistag (1)
Person: Chen-Fu Chien
DBLP: Chien:Chen=Fu
Contributed to:
Wrote 7 papers:
- CASE-2014-HaoLGC #effectiveness #flexibility #markov #network #nondeterminism #problem #scheduling
- An effective Markov network based EDA for flexible job shop scheduling problems under uncertainty (XCH, LL, MG, CFC), pp. 131–136.
- CASE-2014-WangCG #algorithm #constraints #estimation #hybrid #multi #problem #scheduling
- Hybrid estimation of distribution algorithm with multiple subpopulations for semiconductor manufacturing scheduling problem with limited waiting-time constraint (HKW, CFC, MG), pp. 101–106.
- CASE-2014-WuCT #analysis #memory management #modelling #multi
- Multistage semiconductor memory inventory model based on survival analysis (JZW, CFC, YCT), pp. 613–618.
- CASE-2013-ZhengC #enterprise #industrial
- Master production schedule and system for excelling enterprise resources (SEER) in the LED industry (JNZ, CFC), pp. 1034–1039.
- CASE-2007-ChienW
- Structuring Manufacturing Strategy (CFC, JZW), pp. 265–269.
- CASE-2017-ChenWWWC #big data #classification #detection #fault #multi
- Big data analytic for multivariate fault detection and classification in semiconductor manufacturing (YJC, BCW, JZW, YCW, CFC), pp. 731–736.
- CASE-2017-ChienLDCC #modelling #parametricity
- Modeling collinear WATs for parametric yield enhancement in semiconductor manufacturing (CFC, PCL, RD, YJC, CCC), pp. 739–743.