Travelled to:
1 × Italy
1 × Korea
Collaborated with:
B.Yan P.B.Luh S.Wang J.Chang
Talks about:
schedul (2) reticl (2) machin (2) optim (2) litho (2) base (2) multipl (1) balanc (1) setup (1) expir (1)
Person: Hsin Yuan Chen
DBLP: Chen:Hsin_Yuan
Contributed to:
Wrote 2 papers:
- CASE-2012-YanCLWC #scheduling
- Optimization-based litho machine scheduling with load balancing and reticle expiration (BY, HYC, PBL, SW, JC), pp. 575–580.
- CASE-2011-YanCLWC #multi #scheduling
- Optimization-based litho machine scheduling with multiple reticles and setups (BY, HYC, PBL, SW, JC), pp. 114–119.