Travelled to:
1 × China
1 × Germany
2 × USA
Collaborated with:
M.Wimmer P.Tsigas C.W.Keßler D.Cederman J.Gruber F.Versaci U.Dastgeer S.Thibault R.Namyst A.Richards U.Dolinsky S.Benkner S.Pllana
Talks about:
prioriti (2) schedul (2) heterogen (1) structur (1) strategi (1) programm (1) configur (1) support (1) program (1) practic (1)
Person: Jesper Larsson Träff
DBLP: Tr=auml=ff:Jesper_Larsson
Contributed to:
Wrote 5 papers:
- PPoPP-2015-0003GTT #queue
- The lock-free k-LSM relaxed priority queue (MW, JG, JLT, PT), pp. 277–278.
- PPoPP-2014-0003VTCT #data type #scheduling
- Data structures for task-based priority scheduling (MW, FV, JLT, DC, PT), pp. 379–380.
- PPoPP-2013-0003CTT #configuration management #scheduling
- Work-stealing with configurable scheduling strategies (MW, DC, JLT, PT), pp. 315–316.
- DATE-2012-KesslerDTNRDBTP #aspect-oriented #manycore #performance #programmable
- Programmability and performance portability aspects of heterogeneous multi-/manycore systems (CWK, UD, ST, RN, AR, UD, SB, JLT, SP), pp. 1403–1408.
- PDP-1997-KesslerT #library #programming
- Language and library support for practical PRAM programming (CWK, JLT), pp. 216–221.