13 papers:
CASE-2013-DevesseRFW #realtime- A real-time optimal control method for swing-free tower crane motions (WD, MR, LF, JW), pp. 336–341.
CASE-2013-IsmailH #3d #anti #higher-order #using- Trajectory tracking and anti-sway control of three-dimensional offshore boom cranes using second-order sliding modes (RMTRI, QPH), pp. 996–1001.
CASE-2012-GuKJ #distance #metric #multi- Distance measurement for tower crane obstacle based on multi-ultrasonic sensors (LG, XK, JJ), pp. 1028–1032.
CASE-2012-KaneshigeNUMT #algorithm #mobile #online- An algorithm for on-line path planning of autonomous mobile overhead traveling crane based on obstacle information (AK, SN, SU, TM, KT), pp. 914–919.
CASE-2012-TuanKL #3d #feedback- Partial Feedback Linearization Control of the three dimensional overhead crane (LAT, GHK, SGL), pp. 1198–1203.
SAC-2012-ChoeYYR #algorithm #automation #realtime #scheduling #search-based #using- Real-time scheduling of twin stacking cranes in an automated container terminal using a genetic algorithm (RC, HY, YY, KRR), pp. 238–243.
CASE-2011-HuangG #deployment #heuristic- An improved Least Cost Heuristic for dynamic yard crane deployment in container terminals (SYH, XG), pp. 84–89.
ICST-2011-CzerwonkaDNTT #analysis #case study #experience #named #predict- CRANE: Failure Prediction, Change Analysis and Test Prioritization in Practice — Experiences from Windows (JC, RD, NN, AT, AT), pp. 357–366.
SAC-2010-ChoePR #estimation- Dispatching AGVs with noisy estimation of crane operation time (RC, TP, KRR), pp. 1288–1293.
SAC-2010-GuoH #algorithm #clustering- A two stage yard crane workload partitioning and job sequencing algorithm for container terminals (XG, SYH), pp. 2383–2388.
CSL-2006-LautemannTT #algebra- An Algebraic Point of View on the Crane Beach Property (CL, PT, DT), pp. 426–440.
LICS-2001-BarringtonILST- The Crane Beach Conjecture (DAMB, NI, CL, NS, DT), pp. 187–196.
DATE-1999-MoserN #case study #embedded- Case Study: System Model of Crane and Embedded Control (EM, WN), p. 721.