Travelled to:
1 × India
1 × Italy
1 × Korea
1 × Sweden
1 × Taiwan
2 × Canada
3 × USA
Collaborated with:
C.Zhao N.Huang X.Xie J.Wang S.Biller X.Zhong C.H.Swartz J.Arinez P.K.Howard P.A.Bain P.DePriest F.Ju G.Xiao L.Zheng Hyo-Kyung Lee A.J.Musa C.Wang Z.Zeng Y.Feng X.Shao D.A.Wiegmann Y.Lu W.Feng Y.Hu L.E.Holloway D.Blumenfeld S.P.Marin J.Lee John A. Horst Christine Baker Q.Zhang W.Deng Y.Dong C.P.A.Guerrero W.Fan W.Su Gregory A. DeCroix H.Menaker S.G.Sanford-Ring M.Williams S.A.Kraft J.S.Sleeth S.M.Ertl C.Hassemer L.Fiedler Y.Zhao C.Yan Q.Zhao X.Guan Rebecca Jin Jo Goffinet Sujee Lee Tammy Kundinger Craig Sommers
Talks about:
model (13) analysi (12) product (11) manufactur (10) system (10) perform (8) evalu (7) line (7) care (6) qualiti (5)
Person: Jingshan Li
DBLP: Li:Jingshan
Contributed to:
Wrote 34 papers:
- CASE-2015-XieZLSD #agile #analysis #approach #multi #process
- Analysis of multi-patient rapid response processes: An iterative approach (XX, ZZ, JL, CHS, PD), pp. 740–745.
- CASE-2015-ZhaoLH #estimation #flexibility #performance #problem
- Plant flexibility planning: Problem formulation and performance estimation (CZ, JL, NH), pp. 659–664.
- CASE-2015-ZhongLBM #analysis #modelling
- Modeling and analysis of e-visits in primary care (XZ, JL, PAB, AJM), pp. 955–960.
- CASE-2014-JuZDL #bibliography #energy #hybrid
- Review of structures and control of battery-supercapacitor hybrid energy storage system for electric vehicles (FJ, QZ, WD, JL), pp. 143–148.
- CASE-2014-ZengXLMS #evaluation #performance
- An analytical model for performance evaluation of operating room schedules in orthopedic surgery (ZZ, XX, JL, HM, SGSR), pp. 570–575.
- CASE-2014-ZhaoLH #evaluation #exponential #multi #performance
- Performance evaluation of multi-product manufacturing systems with asynchronous exponential machines (CZ, JL, NH), pp. 692–697.
- CASE-2014-ZhongWLKS #simulation
- Primary care redesign: A simulation study at a pediatric clinic (XZ, MW, JL, SAK, JSS), pp. 546–551.
- CASE-2013-JuLXA #evaluation #identification #performance #quality
- Integrated model of productivity and quality in serial production lines with repairs: Performance evaluation and bottleneck identification (FJ, JL, GX, JA), pp. 783–788.
- CASE-2013-ShaoLW #approach #markov
- A Markov chain approach to study flow disruptions on surgery in emergency care (XS, JL, DAW), pp. 990–995.
- CASE-2013-XieLSD #analysis #approach #markov #modelling #process
- Modeling and analysis of hospital inpatient rescue process: A Markov chain approach (XX, JL, CHS, YD), pp. 978–983.
- CASE-2013-ZhaoL #analysis #exponential #multi
- Analysis of multi-product manufacturing systems with homogeneous exponential machines (CZ, JL), pp. 386–391.
- CASE-2013-ZhaoLL #assembly
- Dynamic production control of door manufacturing line at an automotive assembly plant (CZ, YL, JL), pp. 398–403.
- CASE-2013-ZhongLEHF #analysis #modelling #process #testing
- Modeling and analysis of mammography testing process at a breast imaging center of University of Wisconsin medical foundation (XZ, JL, SME, CH, LF), pp. 611–616.
- CASE-2012-XieLSD #agile #evaluation #modelling #performance
- Improving rapid response operations in acute care delivery — part I: System modeling and performance evaluation (XX, JL, CHS, PD), pp. 303–308.
- CASE-2012-XieLSD12a #agile #case study
- Improving rapid response operations in acute care delivery — part II: Continuous improvement and case study (XX, JL, CHS, PD), pp. 309–314.
- CASE-2011-FengZL #evaluation #multi #performance
- Multi-product manufacturing systems with sequence-dependent setups: Performance evaluation and system properties (WF, LZ, JL), pp. 363–368.
- CASE-2011-JuWLBX #framework #simulation
- Virtual battery: A simulation framework for batteries in electric vehicles (FJ, JW, JL, SB, GX), pp. 648–653.
- CASE-2011-WangLH #analysis #modelling
- Modeling and analysis of care delivery services within patient rooms (JW, JL, PKH), pp. 537–542.
- CASE-2010-GuerreroLBX #hybrid #state of the art
- Hybrid/electric vehicle battery manufacturing: The state-of-the-art (CPAG, JL, SB, GX), pp. 281–286.
- CASE-2010-LiH #analysis #framework #modelling #problem
- Modeling and analysis of hospital emergency department: An analytical framework and problem formulation (JL, PKH), pp. 897–902.
- CASE-2010-WangLAB #approach #flexibility #quality
- Improving quality in flexible manufacturing systems: A bottleneck transition approach (JW, JL, JA, SB), pp. 610–616.
- CASE-2009-WangLABH #flexibility #quality
- Monotonic and non-monotonic properties of product quality in flexible manufacturing systems with batch operations (JW, JL, JA, SB, NH), pp. 13–18.
- CASE-2008-HuLH #bibliography #enterprise #modelling #problem #towards
- Towards modeling of resilience dynamics in manufacturing enterprises: Literature review and problem formulation (YH, JL, LEH), pp. 279–284.
- CASE-2008-WangLABH #analysis #flexibility #quality
- Quality analysis in flexible manufacturing systems with batch productions (JW, JL, JA, SB, NH), pp. 460–465.
- CASE-2008-ZhaoYZHLG #performance #simulation
- Efficient simulation for serial production lines based on aggregated event-scheduling (YZ, CBY, QZ, NH, JL, XG), pp. 406–411.
- CASE-2007-WangL #analysis #approximate #modelling #reliability
- Approximate Analysis of Re-Entrant Lines with Bernoulli Reliability Models (CW, JL), pp. 398–403.
- CASE-2005-LiBM #design #quality
- Manufacturing system design to improve quality buy rate (JL, DB, SPM), pp. 209–214.
- CASE-2016-FengZLF #analysis
- Analysis of closed loop production lines in automotive body shops (YF, XZ, JL, WF), pp. 849–854.
- CASE-2016-LeeLMB #community #markov
- A Markov chain model to evaluate patient transitions in small community hospitals (HKL, JL, AJM, PAB), pp. 675–680.
- CASE-2016-SuXLZ #energy #optimisation
- An energy and productivity optimization model in Bernoulli serial lines (WS, XX, JL, LZ), pp. 855–860.
- CASE-2017-LeeJFBGBL #analysis #modelling #process #simulation #using
- Modeling and analysis of postoperative intervention process for total joint replacement patients using simulations (HKL, RJ, YF, PAB, JG, CB, JL), pp. 568–573.
- CASE-2017-LeeLH #algorithm #constraints #design #evaluation #performance
- Iteration algorithms for performance evaluation and buffer design of Bernoulli serial lines with waiting time constraints (JHL, JL, JAH), pp. 654–655.
- CASE-2017-LeeZLZBKSBL #policy
- Incentive-based optimal intervention policy to reduce hospital readmissions for COPD patients (SL, XZ, HKL, CZ, PAB, TK, CS, CB, JL), pp. 562–567.
- CASE-2017-ZhaoLHD #analysis #flexibility #performance #problem
- Optimal planning of plant flexibility: Problem formulation and performance analysis (CZ, JL, NH, GAD), p. 986.