Travelled to:
1 × Canada
1 × Germany
1 × Greece
1 × Japan
1 × Luxembourg
1 × New Zealand
1 × Republic of China
1 × Switzerland
1 × Tunisia
2 × France
2 × Hungary
2 × South Africa
3 × Italy
5 × USA
Collaborated with:
A.Perini A.Marchetto P.Avesani P.Tonella C.Bazzanella G.Scanniello J.Mylopoulos M.Vergne L.Sabatucci L.Penserini A.Cimatti M.Roveri S.Tonetta M.M.Islam A.Siena F.Palma F.Giunchiglia M.W.Asghar A.Tomasi C.D.Francescomarino C.Leonardi M.Zancanaro T.D.Mascio S.Yoo M.Harman Z.Sharafi G.Antoniol Y.Guéhéneuc F.B.Kessler S.Ingolfo I.Jureta I.Hadar T.Kuflik I.Reinhartz-Berger F.Ricca N.A.M.Maiden J.Lockerbie I.K.Karlsen A.Chiappini L.Macchi O.Rebollo B.Vittorini R.Cavada A.Mariotti C.Mattarei A.Micheli S.Mover M.Pensallorto
Talks about:
requir (10) priorit (8) case (7) use (6) model (5) agent (4) test (4) base (4) methodolog (3) softwar (3)
Person: Angelo Susi
DBLP: Susi:Angelo
Contributed to:
Wrote 24 papers:
- CAiSE-2014-VergneS #community #markov #network #open source #using
- Expert Finding Using Markov Networks in Open Source Communities (MV, AS), pp. 196–210.
- CSMR-2013-AsgharMSS #metric #requirements #traceability #using
- Maintainability-Based Requirements Prioritization by Using Artifacts Traceability and Code Metrics (MWA, AM, AS, GS), pp. 417–420.
- ICPC-2013-SharafiMSAG #comprehension #empirical #performance #requirements #visual notation
- An empirical study on the efficiency of graphical vs. textual representations in requirements comprehension (ZS, AM, AS, GA, YGG), pp. 33–42.
- REFSQ-2013-IngolfoSJSPM
- Choosing Compliance Solutions through Stakeholder Preferences (SI, AS, IJ, AS, AP, JM), pp. 206–220.
- CSMR-2012-IslamMSS #multi #semantics #testing
- A Multi-Objective Technique to Prioritize Test Cases Based on Latent Semantic Indexing (MMI, AM, AS, GS), pp. 21–30.
- ICSM-2012-IslamMSKS #algorithm #named #search-based #semantics #sorting #testing
- MOTCP: A tool for the prioritization of test cases based on a sorting genetic algorithm and Latent Semantic Indexing (MMI, AM, AS, FBK, GS), pp. 654–657.
- ICSM-2012-TomasiMFS #named #process
- reBPMN: Recovering and reducing business processes (AT, AM, CDF, AS), pp. 666–669.
- ESEC-FSE-2011-PalmaST #interactive #requirements #smt #using
- Using an SMT solver for interactive requirements prioritization (FP, AS, PT), pp. 48–58.
- CAiSE-2010-LeonardiSSZ #communication #requirements
- Ahab’s Leg: Exploring the Issues of Communicating Semi-formal Requirements to the Final Users (CL, LS, AS, MZ), pp. 455–469.
- ICSE-2010-ChiappiniCMRRSTV #formal method #set #validation
- Formalization and validation of a subset of the European Train Control System (AC, AC, LM, OR, MR, AS, ST, BV), pp. 109–118.
- SAC-2010-HadarKPRRS #case study #comprehension #empirical #modelling #requirements
- An empirical study of requirements model understanding: Use Case vs. Tropos models (IH, TK, AP, IRB, FR, AS), pp. 2324–2329.
- ASE-2009-CavadaCMMMMPRST #requirements #validation
- Supporting Requirements Validation: The EuRailCheck Tool (RC, AC, AM, CM, AM, SM, MP, MR, AS, ST), pp. 665–667.
- HIMI-II-2009-MascioPSS #design #modelling
- Building and Browsing Tropos Models: The AVI Design (TDM, AP, LS, AS), pp. 269–276.
- ISSTA-2009-YooHTS #clustering #effectiveness #scalability #testing
- Clustering test cases to achieve effective and scalable prioritisation incorporating expert knowledge (SY, MH, PT, AS), pp. 201–212.
- CAiSE-2008-SienaMLKPS #case study #effectiveness #modelling #traceability
- Exploring the Effectiveness of Normative i* Modelling: Results from a Case Study on Food Chain Traceability (AS, NAMM, JL, IKK, AP, AS), pp. 182–196.
- SEFM-2008-CimattiRST #constraints #modelling
- Object Models with Temporal Constraints (AC, MR, AS, ST), pp. 249–258.
- ASE-2006-PenseriniPSM #multi #specification
- From Capability Specifications to Code for Multi-Agent Software (LP, AP, AS, JM), pp. 253–256.
- CAiSE-2006-PenseriniPSM #implementation
- From Stakeholder Intentions to Software Agent Implementations (LP, AP, AS, JM), pp. 465–479.
- ICSM-2006-TonellaAS #ranking #testing #using
- Using the Case-Based Ranking Methodology for Test Case Prioritization (PT, PA, AS), pp. 123–133.
- RE-2005-AvesaniBPS #machine learning #requirements #scalability
- Facing Scalability Issues in Requirements Prioritization with Machine Learning Techniques (PA, CB, AP, AS), pp. 297–306.
- SEKE-2005-AvesaniBPS #requirements
- Exploiting Domain Knowledge in Requirements Prioritization (PA, CB, AP, AS), pp. 467–472.
- SEKE-2004-AvesaniBPS #approach #machine learning #process #requirements
- Supporting the Requirements Prioritization Process. A Machine Learning approach (PA, CB, AP, AS), pp. 306–311.
- SEKE-2003-PeriniS #design #using
- Dealing with software design issues using an Agent-Oriented methodology (AP, AS), pp. 224–231.
- SEKE-2002-PeriniSG #architecture #coordination #multi #requirements #specification
- Coordination specification in multi-agent systems: from requirements to architecture with the Tropos methodology (AP, AS, FG), pp. 51–54.