Person: Lars Mönch
DBLP: M=ouml=nch:Lars
Contributed to:
Wrote 14 papers:
- CASE-2015-ForstnerM #optimisation #safety #using
- Using simulation-based optimization to determine production strategies and safety stock levels in semiconductor supply chains (LF, LM), pp. 655–656.
- CASE-2015-MonchY #constraints #parallel #scheduling
- Scheduling jobs on parallel machines with qualification constraints (LM, CY), pp. 657–658.
- CASE-2012-BilykM #heuristic #parallel #problem #search-based
- Variable neighborhood search-based subproblem solution procedures for a parallel shifting bottleneck heuristic for complex job shops (AB, LM), pp. 419–424.
- CASE-2012-DriesselM #case study #composition #heuristic #scheduling
- An exploratory study of a decomposition heuristic for complex shop scheduling with transportation (RD, LM), pp. 413–418.
- ICEIS-v1-2012-Monch #component #design #implementation #scheduling
- Design and Implementation of a Service-based Scheduling Component for Complex Manufacturing Systems (LM), pp. 284–290.
- CASE-2010-DriesselHMS #architecture #assessment #heuristic #parallel #performance #scheduling
- A parallel shifting bottleneck heuristic for scheduling complex job shops: Architecture and performance assessment (RD, UH, LM, WS), pp. 81–86.
- CASE-2009-MonchZ #case study #experience #prototype #state of the art #web #web service
- Providing production planning and control functionality by web services: State of the art and experiences with prototypes (LM, JZ), pp. 495–500.
- CASE-2008-Monch #heuristic #parallel
- Heuristics to minimize total weighted tardiness of jobs on unrelated parallel machines (LM), pp. 572–577.
- CASE-2007-HablaDMPE
- A Short-Term Forecast Method for Demand Quantities in Semiconductor Manufacturing (CH, RD, LM, TP, HE), pp. 94–99.
- CASE-2007-HablaMD #approach #capacity #finite
- A Finite Capacity Production Planning Approach for Semiconductor Manufacturing (CH, LM, RD), pp. 82–87.
- CASE-2017-RochollM #algorithm #multi #order #problem #scheduling #search-based
- Genetic algorithms for a single-machine multiple orders per job scheduling problem with a common due date (JR, LM), pp. 1038–1039.
- CASE-2017-ZiarnetzkyMPE #process
- Rolling horizon planning with engineering activities in semiconductor supply chains (TZ, LM, TP, HE), pp. 1024–1025.
- CASE-2018-KacarMU #problem #reduction #using
- Problem Reduction Approaches for Production Planning Using Clearing Functions (NBK, LM, RU), pp. 931–938.
- CASE-2018-KoppMPS #assessment #performance
- Simulation-based Performance Assessment of Tool Requalification Strategies in Wafer Fabs (DK, LM, DP, MS), pp. 638–641.