Travelled to:
1 × China
2 × USA
Collaborated with:
J.Yi R.Akhavan-Tabatabaei J.G.Shanthikumar W.K.Chan M.T.Zhang D.Song P.v.d.Meulen
Talks about:
cluster (4) tool (4) schedul (3) optim (3) heterogen (2) workstat (2) stochast (2) serial (2) machin (2) singl (2)
Person: Shengwei Ding
DBLP: Ding:Shengwei
Contributed to:
Wrote 6 papers:
- CASE-2008-ChanYDS #clustering #scheduling #tool support
- Optimal scheduling of k-unit production of cluster tools with single-blade robots (WKC, JY, SD, DS), pp. 335–340.
- CASE-2007-ChanYD #clustering #multi #on the #scheduling #tool support
- On the Optimality of One-Unit Cycle Scheduling of Multi-Cluster Tools with Single-Blade Robots (WKC, JY, SD), pp. 392–397.
- CASE-2007-DingAS #modelling #probability
- Stochastic Modeling for Serial-Batching Workstations with Heterogeneous Machines (SD, RAT, JGS), pp. 77–81.
- CASE-2007-DingSA #modelling #probability
- Stochastic Modeling for Serial-Batching Workstations with Heterogeneous Machines (SD, JGS, RAT), p. 91–?.
- CASE-2007-YiDZ0 #analysis #clustering #linear #throughput #tool support
- Throughput Analysis of Linear Cluster Tools (JY, SD, MTZ, PvdM), pp. 1063–1068.
- CASE-2006-DingYZA #clustering #evaluation #multi #nondeterminism #optimisation #performance #process #tool support
- Performance Evaluation and Schedule Optimization of Multi-Cluster Tools with Process Times Uncertainty (SD, JY, MTZ, RAT), pp. 112–117.