Travelled to:
1 × Canada
1 × India
1 × Korea
1 × Sweden
3 × USA
Collaborated with:
S.Bae M.Jeong H.Suh W.Kim K.Park ∅ M.Lee H.Jin Y.Ahn M.K.Mutnuri Jinho Shin Adar A. Kalir Kosta Rozen
Talks about:
line (10) flow (9) semiconductor (5) determinist (5) cluster (5) tool (5) time (5) random (4) model (4) equip (4)
Person: James R. Morrison
DBLP: Morrison:James_R=
Contributed to:
Wrote 17 papers:
- CASE-2015-BaeM #markov #modelling #multi #random
- Markovian modeling of multiclass deterministic flow lines with random arrivals: The case of a single-channel (SYB, JRM), pp. 649–654.
- CASE-2015-JeongMS #composition #design #functional #requirements
- Product modularity to jointly address functional and ecological requirements in the early design stage (MGJ, JRM, HWS), pp. 33–38.
- CASE-2013-JeongMS #approximate #assessment #design #lifecycle #reasoning #using
- Approximate life cycle assessment using case-based reasoning for the eco design of products (MGJ, JRM, HWS), pp. 486–491.
- CASE-2013-JinM #algorithm #clustering #constraints #scheduling #tool support
- Transient scheduling of single armed cluster tools: Algorithms for wafer residency constraints (HYJ, JRM), pp. 856–861.
- CASE-2013-KimM #equilibrium #on the #random
- On the equilibrium probabilities of deterministic flow lines with random arrivals (WsK, JRM), pp. 723–729.
- CASE-2012-KimM #modelling #on the #probability #random #throughput
- On the throughput of deterministic flow lines with random state dependent setups: Stochastic models and applications (WsK, JRM), pp. 650–655.
- CASE-2012-ParkM #behaviour #bound #clustering #hybrid #linear #performance #tool support
- Performance bounds for hybrid flow lines: Fundamental behavior, practical features and application to linear cluster tools (KP, JRM), pp. 371–376.
- CASE-2010-AhnM #analysis #behaviour #clustering #modelling #tool support
- Analysis of circular cluster tools: Transient behavior and semiconductor equipment models (YA, JRM), pp. 39–44.
- CASE-2010-JeongSM #assessment #design #framework #lifecycle #reasoning
- A framework for stepwise life cycle assessment during product design with case-based reasoning (MGJ, HWS, JRM), pp. 118–123.
- CASE-2010-ParkM #evaluation #performance
- Performance evaluation of deterministic flow lines: Redundant modules and application to semiconductor manufacturing equipment (KP, JRM), pp. 45–50.
- CASE-2009-Morrison #clustering #modelling #process #tool support
- Regular flow line models for semiconductor cluster tools: A case of lot dependent process times (JRM), pp. 561–566.
- CASE-2008-Morrison #evolution
- Flow lines with regular service times: Evolution of delay, state dependent failures and semiconductor wafer fabrication (JRM), pp. 247–252.
- CASE-2007-MorrisonM #clustering #on the #throughput #tool support
- On the Throughput of Clustered Photolithography Tools: Wafer Advancement and Intrinsic Equipment Loss (JRM, MKM), pp. 88–93.
- CASE-2017-BaeM #markov #multi #random
- Markovian property for the delays in multiclass deterministic flow lines with random arrivals (SYB, JRM), pp. 729–730.
- CASE-2017-LeeMKR #approximate #on the
- On the accuracy of analytic approximations for the mean cycle time in semiconductor manufacturing equipment with PM events (ML, JRM, AAK, KR), pp. 737–738.
- CASE-2019-BaeM #equivalence #queue #recursion
- Exit Time Recursions, Recording Principles, and Queue Equivalence in Generalized Regular Flow Lines (SYB, JRM), pp. 922–929.
- CASE-2019-ShinLM #assembly #on the #optimisation #parallel
- On the Optimization Of Cycle Time in Assembly Lines with Parallel Workstations and Tasks Requiring Multiple Workers (JS, ML, JRM), pp. 916–921.