Travelled to:
1 × Sweden
Collaborated with:
B.Lennartson K.Bengtsson O.Wigström Nina Sundström Nikolce Murgovski E.Vidarsson Thomas Diding P.Falkman Sabino Francesco Roselli Fredrik Hagebring M.Fabian K.Åkesson Rainer Bischoff 0002 Andreas Aurnhammer
Talks about:
optim (7) energi (6) robot (5) trajectori (3) schedul (2) system (2) effici (2) power (2) time (2) rout (2)
Person: Sarmad Riazi
DBLP: Riazi:Sarmad
Contributed to:
Wrote 9 papers:
- CASE-2015-RiaziBWVL #energy #multi #optimisation
- Energy optimization of multi-robot systems (SR, KB, OW, EV, BL), pp. 1345–1350.
- CASE-2016-RiaziBBAWL #energy #optimisation
- Energy and peak-power optimization of existing time-optimal robot trajectories (SR, KB, RB0, AA, OW, BL), pp. 321–327.
- CASE-2016-SundstromWRL #energy #on the #robust
- On the conflict between energy, stability and robustness in production schedules (NS, OW, SR, BL), pp. 1263–1269.
- CASE-2017-RiaziBL #energy #polynomial
- From trapezoid to polynomial: Next-generation energy-efficient robot trajectories (SR, KB, BL), pp. 1191–1195.
- CASE-2017-RiaziWBL #bound #energy #optimisation
- Energy and peak-power optimization of time-bounded robot trajectories (SR, OW, KB, BL), p. 1301.
- CASE-2017-WigstromMRL #energy #multi #optimisation #performance
- Computationally efficient energy optimization of multiple robots (OW, NM, SR, BL), pp. 515–522.
- CASE-2018-RiaziBL #algorithm #parallel #problem
- Parallelization of a gossip algorithm for vehicle routing problems (SR, KB, BL), pp. 92–97.
- CASE-2019-RiaziDFBL #flexibility #scalability #scheduling
- Scheduling and Routing of AGVs for Large-scale Flexible Manufacturing Systems (SR, TD, PF, KB, BL), pp. 891–896.
- CASE-2019-RoselliHRFA #equivalence #on the #using
- On the Use of Equivalence Classes for Optimal and Sub-Optimal Bin Covering (SFR, FH, SR, MF, KÅ), pp. 1004–1009.